20261004 - Delivery Day for the Nissan Titan XD Platnum Reserve from Carvana.com - Late by 2 hours
October 4, 2024
About: Vehicle: 2016 Nissan Titan XD Platnum Reserve
So on delivery day, the driver was 2 hours late.
While backing my truck off from their truck, the check engine light came on.
I called that out to the driver, he said, "I thought we turned that off for the vehicle inspection." This was said while I was recording with my AI device, and I have the video that shows the actions, from the 3rd floor balcony overlooking the scene.
I will not be making those public, but those are in this database, privately saved, ready for a Judge to hear.
The delivery was to my place in Durham, North Carolina.
The driver told me that if I reject the truck, I have to start all over at the beginning, and wait 2 weeks for my deposit, then I can begin the process again.
He plugged in his code reader, and looked up the codes, and found that it's an EGR valve, which my Chrysler 300 had an issue with the entire time I owned it, and that made it to 598,000 miles.
Turns out it was 2 EGR valves, in the engine, and $5500 worth of work to fix that.
Source: Self Reported